Tuesday, May 24, 2011

BUSY

May 23, 2011---Keith stays real busy performng upkeep tasks on the boat. Got the new house batteries installed with some assistance from Boat Works. After much agony and study on the hot water heater he found a broken wire that has been the problem all along. The cook is much happier with hot water readily available in the galley. Keith proudly installed a new American flag on the mast mounted high on the radar arch. With the water level back down to a comfortable level marina personnel are busy cleaning and repairing from the flood damage. TVA reports a water level of 360.1 feet elevation which is down 12.4 feet from the crest. Anchor and lines we loaned them to secure the docks during high water have been returned. Boater activity is expectd to increase this holiday weekend.

No comments: