Tuesday, August 5, 2008
PEORIA LAKE
8/5/08---Left Heritage Harbor at 9:00 a.m. (mile 242). Said our goodbys to Capt Moe. He provided us with several ears of his home grown corn last night. We could hardly wait to get it cooked and it
proved to be absolutely delicious. Arrived at the Starved Rock Lock at 10:00 a.m. It was another wait as there was a tow in front of the lock. It was the same one (tug named Morgan)we had been in the Dresden Lock with yesterday. Onc
e he was in the chamber, we moved in near his tug and held ropes on the starboard side. Everything was fine until the downstream gate was opened and the tug started to push the barges. His prop wash pulled the bow of our boat off the wall and it just cleared his stern. He recognized my dilemma and stopped his engines. I was then able to manuver the boat back over against the
wall where Keith tied a line to a pin in the wall. All is well and we fianally cleared the lock at noon. We called ahead to the Illinois Valley Yacht Club located at mile 167.9 on the RDB of Peoria Lake. They said we could tie up just past the fuel dock. The entrance to the mari
na is very narrow, so it was a blessing there was no wind at the time we arrived. At 5:00 p.m. the lines were secured to the dock without incident. We drained water from the sediment bowels for the second time today. After checking the engines we enjoyed using th
e club's showers. The restaruant on site was very good. The abbriviation for the club is I.V.Y. as seen behind Maryann.
Monday, August 4, 2008
CHANGED PROPS
8/4/08---At 7:00 a.m. the harbor crew started
getting the lift ready. The boat was sli
d into position and picked up so the props could b
e examined. Props were damaged, but the shafts are okay. Had to lower the boat back into the water and secure it until a wind storm passed. After that the changing of the props went well. These props are the 20" dia w/ 26 pitch. Again back in the water we moved the boat around to the fuel dock and had the holding tank pumped out. Finally ready, we pulled away from Harborside Marina at 10:30 a.m. Arrived at
the Dresden lock 10:50 a
.m., but had to wait for a tow. We got thru the lock at 12:50 p.m. A floater and line were both used to secure the boat away from the tug & barges while we dropped 20'. We continued to the next lock which also lowered us 20'. The wait was not as long. We arrived at 
the Marsailles Lock at 3:00 p.m. and departed at 4:00 p.m. Not wanting to press so hard today we chose to stay at the Heritage Harbor that we enjoyed on our way up a few days ago. We arrived and were tied up and plugged into shore power at 4:30 p.m. This marina is located at mile 242. We started out today at marker 273.7 and therefore made a grand sum of 31.7 miles. We p
lan to do many more miles tomorrow. We are just glad to b
e back in motion.
LAUNDRY
8/3/08---An important day for Maryann. It is her birthday! A fine lunch was had at an Italian Restaurant in Morris. Of course the afternoon was spent doing a necessary job. Two weeks of laundry had to be done. Grocery shopping came next and then back to the boat to put everything away. Just one of those days.
Sunday, August 3, 2008
PREPARATION
8/2/08---A rather busy day. Keith borrowed an Expedition so we could drive into the nearby town of Morris. It is just 13 miles from the Harborside Marina. Located right on the Illinois River it seems like a busy town. After
locating Enterprise, Keith was successful in renting a vehicle. We went back to the marina and returned the borrowed vehicle. Keith & Maryann drove to Alton about 480 miles round trip. They met and picked
up a set of props from our boat dealer, Scott Bachman. These are the original props that were on our boat. They will work until the new ones arrive. We are told it could be as much as 5 weeks delivery on new props. While they made the trip to get props, Carol & I washed the boat. At least the boat looks great sitting quietly in front of the lift.
There have been many of the local boaters stopping by to look at our boat. We get lots of compliments.
Saturday, August 2, 2008
PROPS
8/1/08---What a beautiful day! We pulled out
of the Belmont Harbor at 6:30 a.m. The short trip in Lake Michigan was great, and we got thru the Chicago Harbor Lock with no wait. This lock lowered us just 2' into the Chicago Sanitary and Ship
Canal. The morning trip thru downtown Chicago was great with the sun be
hind us. We also beat one of the bridges being closed for repairs. The work crew was just starting to
get set up. We did have to wait 30 minutes at the Conrail Bridge before the Amtrac trains had cleared and the bridge was raised. The commercial water traffic was not too bad and we made good time going down river. Arriving at the Lockport Lock we got right into the chamber. This lock lowered us 40 feet. Tied to a bollard which goes down with the water makes it quite handy. We cleared the lock ar 12:30 p.m. The Brandon Lock was not as convenient. We had to wait 1 hour for a split tow to clear the chamber. Since this had put us just on the south side of Joliet, we are past the low bridges. The wait gave us time to raise the radar arch and the bimini top. We are grateful for the shade. We arrived at the lock at 1:10 p.m. and cleared at 2:35 p.m. after lowering us 35 feet. Things were going a bit too well I guess. The sun was shining brightly on the channel markers and reflection from the water made them a little dificult to see. The wide open area of water seemed to lure us out of the channel at mile marker 283. The shallow water alarm sounded from the sonar as we turned toward the channel, but it was too late. The loud noise of the props tearing thru rock was very unnerving. The port engine had to be shut down because of excessive vibration. Fortunately the starboard engine could be run at reduced rpm. As we made our way downriver on one engine I called ahead to Harborside Marina. Yes, they have a lift large enough to pick the boat up out of the water. Upon arrival they had personnel available to assist us in getting the boat thru a narrow passage into the harbor and parked us along a wall directly in front of the lift. By now it is 4:00 p.m. on Friday evening and work is over until Monday. We will have all weekend to ponder the navigational error. I am sure the co-captains have learned a valuable lesson.
Friday, August 1, 2008
PHOTO SHOOT
7/31/08---C
arol & Maryann stayed on shore while Keith & I took the boat out of the harbor and into the lake. One purpose was to get some pictures of the boat with the Chicago sky line in the background. After numerous shots we pulled back into the
fuel dock and picked up the ladies. It is important they be on board as we find they are a very helpful crew.
We traveled up the coast line enjoying a smooth r
ide on Lake Michigan. The sun was shining and with no wind the
water was spectacular.
The water is so blue and pretty compared to the muddy Mississippi. Upon returning to the harbor we laid the radar arch & bimini top back down in preparation for our departure from Chicago. There are many low bridges in the Chicago Sanitary & Ship Canal until getting south of Joliet. We are looking forward to a good trip back to Missouri. Nephew (James McGee) picked us up and showed us his apartment. We also spent some at the "Cafe Refreshed" where Julia waited on us. Later James took us to a fine place to eat where we could sit outside on the second level.
Lazy
7/30/08--- Hung around the harbor enjoying the view. Those who have sailboats seem to be most active. Keith & Maryann raised the bimini top & the radar arch in preparation for a cruise in Lake Michigan in the morning.
Subscribe to:
Posts (Atom)